Do NOT follow this link or you will be banned from the site!
     

Rivista - 22/05/2025

Anno XLV - N.1 - 2025

2025 - N. 153

M. Zerbi, L. Flessti , C.G. di Prisco -  Finite Element Analyses of undrained cavity unloading considering in-situ anisotropic state of stress

M. Palomba, L. Repetto, I. Marquez, M. Skwarczynski -The Northern Bypass of Kraków – Design and construction aspects of the TS-14 road tunnel along the expressway S552

P. Poti, M. Rocca, E. Verbesselt - La gestione dell’evacuazione di un treno passeggeri nel Tunnel di base del Moncenisio

E. Dal Negro, A. Picchio, E. Barbero -Tunnel excavation with EPB: innovative products to reduce the amount of water required for soil conditioning

SOMMARIO

R. Bindi

Editoriale

Intervista  a:

Francesco Maria Rotundi

Amministratore Delegato di Acea Infrastructure

 

Finite Element Analyses of undrained cavity unloading considering in-situ anisotropic state of stress

M. Zerbi, L. Flessti , C.G. di Prisco

 

Nota Tecnica The Northern Bypass of Kraków – Design and construction aspects of the TS-14 road tunnel along the expressway S52

M. Palomba, L. Repetto, I. Marquez, M. Skwarczynski

 

Nota Tecnica La gestione dell’evacuazione di un treno passeggeri nel Tunnel di base del Moncenisio

P. Poti, M. Rocca, E. Verbesselt

 

Nota Tecnica: Tunnel excavation with EPB: innovative products to reduce the amount of water required for soil conditioning

E. Dal Negro, A. Picchio, E. Barbero

 

TECNOLOGIA

DAI CANTIERI

VISITA TECNICA

NOTIZIESIG/ITA

SIG YM GROUP

ABBIAMO LETTO 

NOTIZIE FLASH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M. Zerbi, L. Flessti , C.G. di Prisco -  Finite Element Analyses of undrained cavity unloading considering in-situ anisotropic state of stress

M. Palomba, L. Repetto, I. Marquez, M. Skwarczynski -The Northern Bypass of Kraków – Design and construction aspects of the TS-14 road tunnel along the expressway S552

P. Poti, M. Rocca, E. Verbesselt - La gestione dell’evacuazione di un treno passeggeri nel Tunnel di base del Moncenisio

E. Dal Negro, A. Picchio, E. Barbero -Tunnel excavation with EPB: innovative products to reduce the amount of water required for soil conditioning

 

  SIG - Societŕ Italiana Gallerie - Via Giovanni da Procida, 7 – 20149 Milano - T +39 02 25715805 - info@societaitalianagallerie.it - P.I. 04537730014